Montwood Drive Construction Update
UTILITY AND SIDEWALK WORK On Montwood Drive: Contractors have finished back-filling around a box culvert from Trinidad to Honolulu. They have also poured the wall and top for the box culvert. Box Culvert from Trinidad to Honolulu Contractors have also installed an 8" sanitary sewer line and associated manholes at the intersection of Montwood and Windrock. On Windrock: Workers finished installing a curb from Stoneway to Buckwood on both sides of the road. Between Montwood and Stoneway the contractor finished installing a sidewalk on both sides of the road. |
DETOURS Posted detours remain in place along Montwood Drive between McRae and Yarbrough. Eastbound and westbound traffic will continue travelling in the lanes south of the median |
*Information provided by City of El Paso Engineering and Construction Management